Daniel McMenamin 13592
Cuppertino Ln Carmel,
IN 46074 Home
Phone: (317)344-2363 Cell
Phone: (317)828-3694 Summary Senior
Scheduler/Planner with more than twenty years experience in Critical Path
Method (CPM) scheduling for construction, maintenance and operating power
plants. Highly skilled Planning and Scheduling Professional (PSP) with
Primavera Scheduling Products (P3 v3.1, P6). Proficient with Microsoft Office
applications. EXPERIENCE 4/2012-Present
Catalyst, Inc., Indianapolis, IN Senior
Scheduling Engineer Provide scheduling support to clients using appropriate scheduling tools
and applications using Primavera products. Recent assignment at the Exelon
LaSalle Nuclear Power Plant working with the Extended Power Uprate group has
successfully completed. Currently serving as the Master Scheduler for the
Global Serialization Project of Eli Lilly. 11/2010 –
4/2012 Jacobs Engineering GroupIndianapolis, IN Scheduler
(GBNA Group) Maintain the
schedule for the New Wishard Transformation Team replacement hospital project
($740 M). Responsible for the implementation of a fully integrated master
schedule from various prime contractors including development of the methodology
to update the IMS from individual updates without disturbing interproject
links. Provide analysis to various Project Managers on the current status,
projected impact and potential problems. 10/2007 –
11/2010 Catalyst, Inc., Indianapolis, IN
Scheduling Engineer Provide
scheduling support to clients using appropriate scheduling tools and
applications using Primavera products. Clients have included Hunt-Smoot
Midfield Terminal Construction, Indiana Department of Transportation – Major
Moves Project Management Group, Skanska – Scott USAF Base Clinic Renovation,
Nestle Purina PetCare Food Engineering – Schedule Support and Mentoring,
George Allen Construction – Baseline and schedule maintenance. 10/2005 –
10/2007 Smoot Construction Company, Indianapolis IN
Scheduling Manager Develop,
analyze, maintain and update Master Construction CPM schedule of the
Indianapolis Midfield Terminal Project for the Midfield Terminal, Concourses
and Apron Areas. Integrate individual subcontractor schedules into the Master
schedule. Provide schedule deliverables on a routine basis including
look-ahead schedules, summary schedules, critical path, what-if scenario
analysis and detailed predecessor successor reports. Provide technical
expertise for unfamiliar with CPM scheduling and Primavera products in
particular. 6/2003 –
10/2005Jacobs Engineering GroupIndianapolis, IN Senior
Planner/ Scheduler Develop,
analyze, maintain and update CPM schedules from Interactive Planning
Meetings, client interactions and project manager input for Small Projects
Engineering in Indianapolis and Lafayette, Indiana. Develop and maintain
integrated master and subproject schedules for multiple projects in a single
building. 6/2002 - 6/2003Brookhaven
National Laboratory Long Island, NY Project
Controls Scheduler Provide
technical support to clarify and improve the overall baseline schedule
associated with the Brookhaven Graphite Research Reactor Decontamination and
Decommissioning Project. Create and maintain detailed and summary Primavera
resource loaded schedules. Maintain and control baseline schedules and
generate baseline change documentation. 9/2000 -
2/2002 Parsons/Westaff Newport, IN/Oak Ridge, TN Planner/Scheduler
Collect and
schedule information for an Integrated Master Schedule at the Newport Indiana
Chemical Depot. Provide direct schedule interface support to the
Construction, Environmental, Laboratory and Engineering Cost Account
Managers. Adjust constraints and logic within the schedule as needed to
ensure smooth interrelation with other activities. 10/1999 -
9/2000Bechtel Frederick, MD Business
Manager May 2000
to Oct 2000 Provide schedule
and cost support for a single market, in Indianapolis, IN, of an integrated
multi city telecommunications project. Critical issues identification, cost
tracking and coordination of multiple interrelated detailed activities are
included in primary duties. Planner/Scheduler
Oct 1999 to May 2000 Collect and
schedule information for construction craft superintendents in conjunction
with the DC Cook Nuclear Power Plant restart effort. Provide meaningful
schedules for information dissemination. Adjust constraints and logic within
the schedule as needed to ensure smooth interrelation with station
activities. 10/1998 -
10/1999 Information Resources Chicago, IL Project
Analyst Interpret data
collected from various upper management sources and convert into a cross
functional schedule for Information Technology projects. Provide reports for
interdisciplinary decision making committees and turnaround the information
based on the feedback obtained through the use of Primavera Project Planner
(P3). 3/1996 -
5/1998 Commonwealth Edison Zion, IL Cycle Planner Plan, schedule
and coordinate corrective maintenance with testing and preventive maintenance
for all station departments. Provide scheduling information using PSDI
Project 2 and the Electronic Work Control System used at Commonwealth Edison.
3/1993 -
3/1996 Commonwealth Edison Zion, IL System
Engineering Scheduler/Planner 10/1988 -
3/1993 Commonwealth Edison Zion, IL Licensed Shift
Supervisor 8/1981 -
10/1988 Commonwealth Edison Zion, IL Quality
Assurance Engineer 3/1973 -
8/1981 United States Navy Washington, DC Machinist Mate
First Class (SS) EDUCATION Bachelor's
Degree from Northern Illinois University Aug 1999 Senior Reactor
Operator License for Zion Unit 1 & 2 held 1983 -1994 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||